Authority. An Israeli-certified surveyor, engineer or architect should prepare
applications. Applications for permits on “settled” (registered) land should include:
•
•
•
A completed “Application for a Building Permit and Use of the
Property” form, which includes a detailed description of the property
and the planned structure (e.g. whether it is a new building, or an
addition to an existing building), the purpose of the planned structure
(e.g. residential, business, etc.), and a declaration by all contractors
who will be responsible for the building’s construction specifying the
building materials to be used. Everyone who holds rights to the land
should sign this form;
The applicant must provide maps and charts illustrating the planned
structure, the borders of the plot, the external and internal designs of
the planned structure and any nearby infrastructure. An Israeli-certified
surveyor should sign these documents;
When the owner of a property dies, his heirs must apply for an inheritance
deed. This certificate is issued by a religious court or the civil inheritance
office and must specify the particular plot of land in question. Only the
lawful successor(s) is authorized to sign the application: (a) once it is
registered with the Land Registry; or (b) once it is registered with the
Land Settlement Officer when the land is in the process of settlement.
Applicants for a permit to build on land that is neither registered nor “under
settlement” should provide all the documents necessary for registering land “under
settlement” excluding a deed from the Land Settlement Officer, but additionally:
•
•
An affidavit from the individual registered in the files of the tax
authorities, proof of identity and how they gained rights to the land
(e.g. inheritance, purchase, etc.);
A plan for Registration Purposes. This is where the approved outline
scheme for the property’s area amended the borders of the plot as they
were registered during the process of “land settlement”. The plan costs
several thousand US dollars and there are also legal fees for the required
lawyer’s registration with the Israeli Land Administration.
Additionally, the website400 of the Jerusalem Municipality’s Department of Licenses
provides details on applying for a building permit.